Loading..
Processing... Please wait...

Product was successfully added to your shopping cart.




© 2018 Manfred of Sweden.
 
0 item(s) - €0.00

Deauville Traditional Long Lead

€85.00

Be the first to review this product

Availability: In Stock

Product Code: 52

* Required Fields

Description

Deauville
BEAUTIFUL YET SIMPLE TRADITIONAL LONG WALKING LEAD. 

Full Vegetable Tanned Leather with a semi-aniline finish and greased grain to give a superb patina.
All Bridle leather hides are traditionally pit tanned and hand curried to ensure
that the fibres are well meshed for strength and that the leather is smooth.

Details

Deauville
BEAUTIFUL YET SIMPLE TRADITIONAL LONG WALKING LEAD. 

Full Vegetable Tanned Leather with a semi-aniline finish and greased grain to give a superb patina.
All Bridle leather hides are traditionally pit tanned and hand curried to ensure
that the fibres are well meshed for strength and that the leather is smooth.

Bridle leather is the most labour intensive product produced.

The Master Currier has to ensure that the leather is as free of growth as possible,
while maintaining the quality of the grain and the strength and visual appeal of a Bridle hide.
Leather is available in a range of traditional colours.

Comments
Product Tags

Use spaces to separate tags. Use single quotes (') for phrases.